Click here to see a slide show of 100 years of energy production in Louisiana
Engineering Division · Permit and Reservoir Section

Enhanced Recovery Pilot Projects

A pilot project is essentially a test project to determine how well production can be enhanced by using either water flood or gas injection to maintain the reservoir pressure. 

An application is reviewed for the following criteria:

  • A letter requesting and outlining the details of the Enhanced Recovery Pilot Project.
  • A reservoir structure map showing the reservoir boundaries with all of the leases in the immediate area identified, the existing wells identified as proposed producers or injection, the approximate acreage of the reservoir, and the scale of the map.
  • A reservoir production history to justify the need of the Pilot Project, either tabular or graphical.
  • If the reservoir crosses any lease line, then all of the lessors' written approvals of the project are required.
  • A completed Enhanced Recovery Questionnaire must be submitted with the Pilot Project request: Excel Format, Adobe Acrobat Format

Return to the Permits Section Main Page
 

P.O. Box 94275 · Baton Rouge, La 70804-9275 · 617 North Third Street · Baton Rouge, La 70802
Voice 225.342.5570 Fax 225.342.2584
Revised on Friday March 01 2002 by the DNR Web Team