|
||||||||
West Pointe a la Hache Siphon DiversionState Project Number: BA-04 Description:This project involves the construction of eight parallel siphons to divert water from the Mississippi River, over the levee, and into the adjacent wetlands on the west side of the river near Pointe a la Hache, Louisiana. The maximum discharge of the siphons is 2,100 cubic feet per second, which will potentially deliver up to 150,000 cubic yards of river sediment into the wetlands annually. Reports Available:Project Information: |
||||||||
| Code updated Tuesday, May 12, 2009 7:26:05 AM | ||||||||