DNR > OCRM > CED > Coastal Restoration Projects > CS-18
CED
Home
Contacts
Projects
Coastal Studies and Findings
CWPPRA Partners
 
OCM
Home
Physical Addresses
News Releases
Coastal Facts
Careers
Contacts
Related Sites
Coastal Engineering
Coastal Restoration
About OCM
 
OCM Divisions
Coastal Management

Sabine National Wildlife Refuge Erosion Protection

State Project Number: CS-18
Project Priority List (PPL): 01
Federal Sponsor: United States Fish and Wildlife Service (USFWS)
Project Type: Shoreline Protection
Construction Completion Date: 1995

Description:

The goal of this project is to protect 13,000 acres of fresh marsh from deterioration associated with the anticipated failure of the existing west levee. The original design was to reconstruct 5.5 miles of eroded levee. The project was redesigned to include 1,000 feet of levee reconstruction and 5.5 miles of rock armor. Vegetation plantings were used to reduce erosion from boat traffic.

Reports Available:

Search for Project Documents

Project Information:

CWPPRA Project Page (including Geospatial Data)

Request Project Data

  DNR Search DNR News Releases DNR Events Calendar DNR Career Opportunities DNR Contacts
  Code updated Tuesday, May 12, 2009 7:26:05 AM
Visit Louisiana.gov Terrebonne basin image Jonathan Davis Wetland Protection project Fritchie Marsh Restoration project image DNR Seal LaSalle Building, Baton Rouge Timbalier Islands Mississippi River basin image Sabine Terraces Terrebonne basin image DNR Seal