The following table lists approved CWPPRA, implemented State, and non-CWPPRA Federal restoration projects alphabetically by Project Name. To change the sort order, click on a column heading. For clarification of abbreviations used in the table, see the abbreviation keys at the bottom of this page.

State Project Number PPL Federal Sponsor Project NameSorted by this column in descending order
PO-34 16  USACE  Alligator Bend Marsh Restoration and Shoreline Protection
AT-02 02  NMFS  Atchafalaya Sediment Delivery
TE-49 12  USACE  Avoca Island Diversion and Land Building
BA-05c N/A    Baie de Chactas
BA-38 11  NMFS  Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration
BA-27c 09  NRCS  Barataria Basin Landbridge Shoreline Protection, Phase 3
BA-27d 11  NRCS  Barataria Basin Landbridge Shoreline Protection, Phase 4
BA-27 07  NRCS  Barataria Basin Landbridge Shoreline Protection, Phases 1 and 2
BA-26 06  NRCS  Barataria Bay Waterway East Side Shoreline Protection
BA-23 04  NRCS  Barataria Bay Waterway West Side Shoreline Protection
BA-19 01  USACE  Barataria Bay Waterway Wetland Restoration
BICM N/A  USACE  Barrier Island Comprehensive Monitoring (BICM)
PO-25 08  NMFS  Bayou Bienvenue Pump Station Diversion and Terracing (Deauthorized)
TE-33 06  EPA  Bayou Boeuf Pump Station (Deauthorized)
PO-02c N/A    Bayou Chevee
PO-22 05  USACE  Bayou Chevee Shoreline Protection
BA-48 17  NMFS  Bayou Dupont Ridge Creation and Marsh Restoration
PO-17 01  USACE  Bayou LaBranche Wetland Creation
TE-03 N/A    Bayou LaCache Wetland
BA-25 05  EPA  Bayou Lafourche Siphon (Phase 1)
BS-13 15  EPA  Bayou Lamoque Freshwater Diversion
BA-22 04  NRCS  Bayou L'Ours Ridge Hydrologic Restoration (Deauthorized)
BA-21 03  NMFS  Bayou Perot/Bayou Rigolettes Marsh Restoration (Deauthorized)
TV-20 13  NRCS  Bayou Sale Shoreline Protection
PO-16 01  USFWS  Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1
PO-18 02  USFWS  Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2
BA-16 N/A    Bayou Segnette
MR-08 04  USACE  Beneficial Use of Hopper Dredged Material Demonstration (Deauthorized)
MR-13 10  USACE  Benneys Bay Diversion
AT-03 02  NMFS  Big Island Mining
LA-08 17  NMFS  Bio-Engineered Oyster Reef Demonstration
CS-29 09  NRCS  Black Bayou Culverts Hydrologic Restoration
CS-27 06  NMFS  Black Bayou Hydrologic Restoration
CS-BL N/A    Blind Lake
BS-15 17  EPA  Bohemia Mississippi River Reintroduction
TV-09 02  NRCS  Boston Canal/Vermilion Bay Bank Protection
TE-28 03  NRCS  Brady Canal Hydrologic Restoration
BD N/A    Brannon Ditch
CS-09 02  NRCS  Brown Lake Hydrologic Restoration
BRM-01 N/A    Brown Marsh
BS-03a 02  NRCS  Caernarvon Diversion Outfall Management
BS-08 N/A  USACE  Caernarvon Freshwater Diversion
BS-16 17  USFWS  Caernarvon Outfall Management/Lake Lery Shoreline Restoration
CS-17 01  USFWS  Cameron Creole Plugs
ME-09 01  USFWS  Cameron Prairie National Wildlife Refuge Shoreline Protection
CS-04a 03  NRCS  Cameron-Creole Maintenance
CS-04a-1 N/A    Cameron-Creole Structure Automation
AT-04 09  NMFS  Castille Pass Channel Sediment Delivery
PO-08 N/A    Central Wetlands Pump Outfall
PO-27 09  NMFS  Chandeleur Islands Marsh Restoration
MR-06 03  USACE  Channel Armor Gap Crevasse
CAT-01 N/A    Cheniere Au Tigre
TV-16 06  NRCS  Cheniere Au Tigre Sediment Trapping Demonstration
CS-22 02  USACE  Clear Marais Bank Protection
LA-03b 11  NRCS  Coastwide Nutria Control Program
CRMS-WETLANDS N/A  USGS  Coastwide Reference Monitoring System - Wetlands
CS-26 04  EPA  Compost Demonstration (Deauthorized)
TV-04 03  NRCS  Cote Blanche Hydrologic Restoration
BA-01 N/A  USACE  Davis Pond Freshwater Diversion
BA-36 11  USFWS  Dedicated Dredging on the Barataria Basin Landbridge
LA-01 N/A    Dedicated Dredging Program
LA-01b N/A    Dedicated Dredging Program - Bayou Dupont
LA-01e N/A    Dedicated Dredging Program - Grand Bayou Blue
LA-01a N/A    Dedicated Dredging Program - Lake Salvador
LA-01c N/A    Dedicated Dredging Program - Pass a Loutre
LA-01f N/A    Dedicated Dredging Program - Point Au Fer
LA-01d N/A    Dedicated Dredging Program - Terrebonne Parish School Board
BA-33 10  USACE  Delta Building Diversion at Myrtle Grove
BS-10 10  USACE  Delta Building Diversion North of Fort St. Philip
BS-11 10  USFWS  Delta Management at Fort St. Philip
MR-09 06  NMFS  Delta Wide Crevasses
ME-08 01  NRCS  Dewitt-Rollover Vegetative Plantings Demonstration (Deauthorized)
MR-10 06  USACE  Dustpan Maintenance Dredging Operations for Marsh Creation in the Mississippi River Delta Demonstration
TV-21 14  NRCS  East Marsh Island Marsh Creation
CS-20 02  NRCS  East Mud Lake Marsh Management
CS-32 10  USFWS  East Sabine Lake Hydrologic Restoration
TE-25 03  NMFS  East Timbalier Island Sediment Restoration, Phase 1
TE-30 04  NMFS  East Timbalier Island Sediment Restoration, Phase 2
BA-30 09  NMFS  East/West Grand Terre Islands Restoration
BS-13 (EB) N/A  MMS  EB - Bayou Lamoque Floodgate Removal
PO-37 (EB) N/A  MMS  EB - Blind River Freshwater Diversion
BA-45 (EB) N/A  MMS  EB - Caminada Headlands
BA-36 (EB) N/A  MMS  EB - Dedicated Dredging on Barataria Landbridge
BA-30 (EB) N/A  MMS  EB - East Grand Terre
TV-11b (EB) N/A  MMS  EB - Freshwater Bayou Bank Stabilization
TE-43 (EB) N/A  MMS  EB - GIWW Bank Restoration of Critical Areas of Terrebonne
ME-21 (EB) N/A  MMS  EB - Grand Lake Shoreline Protection
BA-15x-2 (EB) N/A  MMS  EB - Lake Salvador Shoreline Protection Phase III
BA-43 (EB) N/A  MMS  EB - Long Distance Mississippi River Sediment Pipeline
CS-35 (EB) N/A  MMS  EB - Marsh Creation via Beneficial Use (Phase 1)
PO-36 (EB) N/A  MMS  EB - Orleans Landbridge Shoreline Protection and Marsh Creation
ME-18 (EB) N/A  MMS  EB - Rockefeller Refuge Gulf Shoreline Stablization
PO-35 (EB) N/A  MMS  EB - Violet Diversion
PO-21 04  NMFS  Eden Isles East Marsh Restoration (Deauthorized)
TE-53 16  EPA  Enhancement of Barrier Island Vegetation Demonstration
TE-17 01  NRCS  Falgout Canal Planting Demonstration
TE-02 N/A    Falgout Canal Wetland
CIAPFIFI N/A    Fifi Island Restoration
FTL-01 N/A    Fisheries Habitat Restoration on West Grand Terre Island at Fort Livingston
LA-05 12  NRCS  Floating Marsh Creation Demonstration Project
TE-31 04  NRCS  Flotant Marsh Fencing Demonstration (Deauthorized)
TV-18 09  NMFS  Four Mile Canal Terracing and Sediment Trapping
BA-18 01  NMFS  Fourchon Hydrologic Restoration (Deauthorized)
TV-11 N/A    Freshwater Bayou Bank Protection
ME-13 05  NRCS  Freshwater Bayou Bank Stabilization
TV-11b 09  USACE  Freshwater Bayou Bank Stabilization - Belle Isle Canal to Lock
ME-04 02  NRCS  Freshwater Bayou Wetland Protection
ME-16 09  USFWS  Freshwater Introduction South of Highway 82
PO-06 02  NRCS  Fritchie Marsh Restoration
CS-30 09  NRCS  GIWW - Perry Ridge West Bank Stabilization
BA-02 01  NRCS  GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration
TE-43 10  NRCS  GIWW Bank Restoration of Critical Areas in Terrebonne
PO-33 13  USFWS  Goose Point/Point Platte Marsh Creation
BS-07 04  USACE  Grand Bay Crevasse (Deauthorized)
TE-10 05  USFWS  Grand Bayou Hydrologic Restoration
GIBSB N/A    Grand Isle Bay Side Breakwaters
ME-21 11  USACE  Grand Lake Shoreline Protection
ME-19 10  USFWS  Grand-White Lakes Landbridge Protection
TV-02a N/A    Hammock Lake
CS-21 02  NRCS  Highway 384 Hydrologic Restoration
CS-01 N/A    Holly Beach
CS-31 11  NRCS  Holly Beach Sand Management
PO-24 08  NMFS  Hopedale Hydrologic Restoration
ME-11 08  NRCS  Humble Canal Hydrologic Restoration
TE-20 01  EPA  Isles Dernieres Restoration East Island
TE-24 02  EPA  Isles Dernieres Restoration Trinity Island
BA-20 02  NRCS  Jonathan Davis Wetland Protection
BA-29 09  EPA  LA Highway 1 Marsh Creation (Deauthorized)
PO-03b N/A    LaBranche Shoreline Protection
PO-03 N/A    LaBranche Shoreline Stabilization and Canal Closure
PO-28 09  NMFS  LaBranche Wetlands Terracing, Planting, and Shoreline Protection (Deauthorized)
PO-32 12  USACE  Lake Borgne and MRGO Shoreline Protection
PO-30 10  EPA  Lake Borgne Shoreline Protection
TE-26 03  NMFS  Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island
BA-42 15  USFWS  Lake Hermitage Marsh Creation
BS-06 N/A    Lake Lery Hydrologic Restoration
TV-17 08  NRCS  Lake Portage Land Bridge
BA-15 03  NMFS  Lake Salvador Shore Protection Demonstration
BA-15x1 N/A    Lake Salvador Shoreline Protection Extension
BA-37 11  NMFS  Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake
ME-17 09  NRCS  Little Pecan Bayou Hydrologic Restoration
TV-12 05  NMFS  Little Vermilion Bay Sediment Trapping
TE-19 01  NMFS  Lower Bayou LaCache Hydrologic Restoration (Deauthorized)
TE-07b N/A    Lower Petit Caillou
TE-51 16  NMFS  Madison Bay Marsh Creation and Terracing
TE-41 09  USFWS  Mandalay Bank Protection Demonstration
TE-35 06  USACE  Marsh Creation East of the Atchafalaya River - Avoca Island (Deauthorized)
TV-06 N/A    Marsh Island Control Structures
TV-14 06  USACE  Marsh Island Hydrologic Restoration
PO-19 03  USACE  Mississippi River Gulf Outlet (MRGO) Disposal Area Marsh Protection
BA-25b N/A    Mississippi River Reintroduction Into Bayou Lafourche
BA-34 10  EPA  Mississippi River Reintroduction Into Northwest Barataria Basin
BA-39 12  EPA  Mississippi River Sediment Delivery System - Bayou Dupont
MR-12 12  USACE  Mississippi River Sediment Trap
TE-01 N/A    Montegut Wetland
TE-42 09  USFWS  Move Existing Atchafalaya Water to Central Terrebonne
BA-24 05  NMFS  Myrtle Grove Siphon (Deauthorized)
BA-03c 05  NRCS  Naomi Outfall Management
BA-03 N/A    Naomi Siphon Diversion
TE-37 09  EPA  New Cut Dune and Marsh Restoration
NGI N/A    North Grand Isle Breakwaters
TE-32a 06  USFWS  North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management
TE-44 10  USFWS  North Lake Mechant Landbridge Restoration
LA-03a 06  USFWS  Nutria Harvest for Wetland Restoration Demonstration
TV-13a 06  NRCS  Oaks/Avery Canal Hydrologic Restoration, Increment 1
TV-13b N/A    Oaks/Avery Structures
PO-26 09  USACE  Opportunistic Use of the Bonnet Carre Spillway (Deauthorized)
BA-35 11  NMFS  Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration
MR-07 03  USACE  Pass-a-Loutre Crevasse (Deauthorized)
ME-01 N/A    Pecan Island Freshwater Introduction
ME-14 07  NMFS  Pecan Island Terracing
TE-34 06  NRCS  Penchant Basin Natural Resources Plan, Increment 1
MR-11 09  USACE  Periodic Introduction of Sediment and Nutrients at Selected Diversion Sites Demonstration
CS-24 04  NRCS  Perry Ridge Shore Protection
CS-25 04  NRCS  Plowed Terraces Demonstration
TE-22 02  NMFS  Point Au Fer Canal Plugs
TE-14 N/A    Point Farm Refuge Planting
TE-06 N/A    Pointe-aux-Chenes Hydrologic Restoration
BA-05b N/A    Queen Bess
TV-4355np1 N/A    Quintana Canal/Cypremort Point
TE-29 05  NRCS  Raccoon Island Breakwaters Demonstration
RI N/A    Raccoon Island Repair
TE-48 11  NRCS  Raccoon Island Shoreline Protection/Marsh Creation
RAINEY N/A    Rainey Audubon Wildlife Sanctuary Earthen Terraces
PO-20 03  EPA  Red Mud Demonstration (Deauthorized)
CS-23 03  USFWS  Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully
PO-29 11  EPA  River Reintroduction into Maurepas Swamp
BA-40 14  NMFS  Riverine Sand Mining/Scofield Island Restoration
ME-18 10  NMFS  Rockefeller Refuge Gulf Shoreline Stabilization
CS-02 N/A    Rycade Canal Marsh Management
CS-18 01  USFWS  Sabine National Wildlife Refuge Erosion Protection
CS-28 08  USACE  Sabine Refuge Marsh Creation, Cycles 1-3
SSB N/A    Sabine Shellbank Stabilization
CS-ST N/A    Sabine Terraces
LA-09 17  NRCS  Sediment Containment System for Marsh Creation Demonstration
TV-15 06  NMFS  Sediment Trapping at "The Jaws"
TE-47 11  EPA  Ship Shoal: Whiskey West Flank Restoration
LA-06 13  USACE  Shoreline Protection Foundation Improvements Demonstration
MR-01b N/A    Small Sediment Diversions
ME-20 11  USFWS  South Grand Chenier Hydrologic Restoration Project
TE-39 09  NRCS  South Lake DeCade Freshwater Introduction
ME-23 15  NMFS  South Pecan Island Freshwater Introduction
BA-41 14  NRCS  South Shore of The Pen Shoreline Protection and Marsh Creation
ME-22 12  USACE  South White Lake Shoreline Protection
ME-24 16  USACE  Southwest Louisiana Gulf Shoreline Nourishment and Protection
ME-12 03  NRCS  Southwest Shore White Lake Demonstration (Deauthorized)
MR-14 13  USACE  Spanish Pass Diversion
SBG N/A    Spoilbank along the GIWW
CS-11b 05  NRCS  Sweet Lake/Willow Lake Hydrologic Restoration
TE-45 10  USFWS  Terrebonne Bay Shore Protection Demonstration
TE-36 07  NRCS  Thin Mat Floating Marsh Enhancement Demonstration
TE-40 09  EPA  Timbalier Island Dune and Marsh Creation
TE-18 01  NRCS  Timbalier Island Planting Demonstration
PO-10 N/A    Turtle Cove Shore Protection
BS-09 08  NRCS  Upper Oak River Freshwater Siphon, Phase 1 (Deauthorized)
BA-28 07  NMFS  Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island
MR-15 15  EPA  Venice Ponds Marsh Creation and Crevasses
TV-03 01  USACE  Vermilion River Cutoff Bank Protection
PO-09a 03  NRCS  Violet Freshwater Distribution (Deauthorized)
PO-01 N/A    Violet Siphon Diversion
TV-19 09  USACE  Weeks Bay Marsh Creation and Shore Protection/Commercial Canal Freshwater Redirection
MR-03 01  USACE  West Bay Sediment Diversion
TE-52 16  NMFS  West Belle Pass Barrier Headland Restoration
TE-23 02  USACE  West Belle Pass Headland Restoration
CS-19 01  NRCS  West Hackberry Vegetative Planting Demonstration
TE-46 11  USFWS  West Lake Boudreaux Shoreline Protection and Marsh Creation
BA-47 17  NRCS  West Pointe a la Hache Marsh Creation
BA-04c 03  NRCS  West Pointe a la Hache Outfall Management
BA-04 N/A    West Pointe a la Hache Siphon Diversion
TE-50 13  EPA  Whiskey Island Back Barrier Marsh Creation
TE-27 03  EPA  Whiskey Island Restoration
BS-12 14  NRCS  White Ditch Resurrection and Outfall Management
BS-04a 03  NRCS  White's Ditch Outfall Management (Deauthorized)
TV-02b N/A    Yellow Bayou

RETURN TO TOP

Other State Projects Include:
Project Number Basin Key
Abbrev. Basin
AT Atchafalaya
BA Barataria
BS Breton Sound
CS Calcasieu/Sabine
LA Coastal Louisiana
ME Mermentau
MR Mississippi River
PO Pontchartrain
TE Terrebonne
TV Teche/Vermillion
Federal Sponsor Key
Abbrev. Sponsor
EPA Environmental Protection Agency
NMFS National Marine Fisheries Service
NRCS Natural Resources Conservation Service
USACE United States Army Corps of Engineers
USFWS United States Fish and Wildlife Service
USGS United States Geological Survey
  DNR Search DNR News Releases DNR Events Calendar DNR Career Opportunities DNR Contacts
  Code updated Monday, February 16, 2009 7:09:46 AM; Load Time: 0.1250 seconds
Visit Louisiana.gov Terrebonne basin image Jonathan Davis Wetland Protection project Fritchie Marsh Restoration project image DNR Seal LaSalle Building, Baton Rouge Timbalier Islands Mississippi River basin image Sabine Terraces Terrebonne basin image DNR Seal