Table 7
Louisiana Electric Utilities
System Peak Load And Total Capability
1982 - 1995
Megawatts
Utility System Peak Load
Utility System 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995
CLECO 1,314 1,115 1,010 1,065 1,182 1,141 1,123 1,148 1,218 1,233 1,308 1,346 1,310 1,490
GSU 5,164 5,348 5,475 5,139 5,089 4,991 4,910 5,040 5,388 5,224 5,247 5,612 Note 3 Note 3
ENTERGY 10,382 10,870 10,456 10,870 11,697 11,270 11,442 11,485 12,189 11,852 11,963 12,858 18,028 19,591
SWEPCO 2,668 2,849 2,948 2,943 3,140 3,085 3,153 3,045 3,252 3,200 3,237 3,651 3,526 3,932
Cajun Electric Co-op 1,623 1,891 2,033 1,731 1,898 1,633 1,800 1,661 1,809 1,781 1,775 1,781 1,788 1,821
LEPA Members NA NA NA NA NA NA NA NA 307 303 306 326 340 334
City Of Ruston NA NA NA NA 51 49 53 51 54 52 53 59 56 62

Non-Coincidental Combined Systems
Peak Load (See Note 1)
21,151 22,073 21,922 21,748 23,057 22,169 22,481 22,430 24,217 23,645 23,889 25,633 25,048 27,230

Utility System Capability At Time Of Peak
Utility System 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995
CLECO 1,551 1,551 1,388 1,388 1,708 1,708 1,701 1,706 1,706 1,706 1,706 1,706 1,706 1,706
GSU 7,208 7,152 6,780 6,610 7,548 6,926 6,866 6,609 6,553 6,471 6,709 6,704 Note 3 Note 3
ENTERGY 13,737 14,193 13,885 15,044 16,028 15,433 15,392 15,650 14,365 14,100 14,147 14,029 20,884 20,649
SWEPCO 2,350 2,900 2,840 2,932 3,631 3,350 3,770 3,323 3,612 3,429 3,661 4,051 4,181 4,312
Cajun Electric Co-op 1,310 1,850 1,623 1,623 1,905 1.905 1,905 1,905 1,884 1,884 1,884 1,884 1,884 1,919
LEPA Members NA NA NA NA NA NA NA NA 416 419 423 426 427 361
City Of Ruston NA NA NA NA 91 91 91 91 91 91 91 91 91 91

Non-Coincidental Combined Systems
Capability (See Note 1)
26,156 27,646 26,516 27,597 30,911 29,413 29,725 29,284 28,627 28,100 28,621 28,891 29,173 29,038

Combined Reserve Margin
(Capability minus Peak Load)
5,005 5,573 4,594 5,849 7,854 7,244 7,244 6,854 4,410 4,455 4,732 3,258 4,125 1,808

Percent Reserve Margin
(Reserve Margin/Peak Load X 100)
23.66% 25.25% 20.96% 26.89% 34.06% 32.68% 32.22% 30.56% 18.21% 18.84% 19.81% 12.71% 16.47% 6.64%

Percent Capacity Margin
(Reserve Margin/ Capability X 100)
19.14% 20.16% 17.33% 21.19% 25.41% 24.63% 24.37% 23.41% 15.41% 15.85% 16.53% 11.28% 14.14% 6.23%

Notes:
-1. The combined systems capability shown did not occur coincindentally with the combined systems peak load.

-2. The CLECO system is entirely within Louisiana. The SWEPCO system includes portions of Louisiana, Texas, and Arkansas.

-3. As a result of GSU's merger with Entergy on 12131/93, GSU's figures for 1994 areincluded with Entergy's. The Entergy system now includes portions of Louisiana, Mississippi, Texas, and Arkansas.

-4. 1995 peak loads and capabilities through mid-August.
Sources:
-Company Annual Reports, Statistical Supplements to Annual Reports, SEC Form 10-Ks, and Utility representatives.
NA - Not Available